Plasterboard welded Installation |
|
|
|
|
Installation of 30 mm (1.2 in) insulation with an aluminum vapor barrier |
Mats are fixed on insulation with adhesive tapes |
|
|
|
|
Mats are tested under 10 bars (145 psi) |
Piping is set up to the hydraulic station |
|
|
|
|
Plaster boards are fixed in a traditional way, pressing the mats |
The adhesive tape is put off during the installation |
|
|
|
|
KaRo mats can be installed in a renovation, without any volume change |
The final product can suit any situation, here a reception hall |
| More detailed information is available for installation of Plasterboard ceilings (pdf format, in French) |
|